Add about 10 to that number to account for any possible mistakes and warped boards.
Preparing concrete floor for carpet.
For below grade slabs assume that the concrete floor will get damp at some point.
In order to prevent moisture and mildew from penetrating the carpeting it is important to prepare your concrete basement floor prior to the installation.
Remove any carpet or other flooring.
The care that you take with flooring preparation will help your new carpet to last as long as possible.
Plywood carpet pad and carpet as shown.
For concrete and ceramic tile floors you should consider consulting a professional.
Determine how much flooring and materials will be needed.
Install tile directly on the concrete floor.
Test the floor for moisture.
Installing carpet tiles aka carpet squares over concrete is a simple process that most people can do without any experience.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
This option works best when the concrete floor is in good condition so take care to follow all of the steps below to.
Multiply length times width of the room.
General instructions for surface preparation of concrete substrates for application of a polymer floor coating or overlay system.
Some experts believe in evening out all the grout with leveling compound before laying carpet which is a tricky job for a novice.
If you don t have all the tools or you want to be 100 sure you don t waste any material invite a friend over to help you.
In many cases you can lay tile directly on the concrete surface which is naturally hard and durable.
You then have two options depending on your circumstances.
Leave the vinyl in place for 72 hours.
They work as wall to wall carpeting or as an area rug and the carpet squares can be replaced individually as needed rather than needing to replace the entire carpet.
Any kind of persistent moisture will allow mold to get a foothold and soon ruin carpet or wood flooring.
Take a look at the two most common options for preparing a concrete floor.
You can either do this preparation yourself or hire someone to do it.
In order to achieve optimum adhesion the substrate must be clean and prepared properly.
If you have made the decision to refinish your basement the renovations probably include the installation of a new carpet.
And both of the options use the same layers of 1 2 in.
Patch up any cracks and fill in valleys in a concrete floor.
The steps that are required differ slightly depending upon whether you are replacing carpet or preparing a wood concrete or tile floor.
Also it is important to take time and prepare well before you start assembling.