Above ground deck piers are precast tapered concrete blocks with a wide base that are intended to rest directly on the ground or a concrete base.
Pre poured concrete piers.
The number of concrete piers required will depend on the dimensions of the shed.
Making the piers level vertically and horizontally increases the level of difficulty.
Ez tube 5 includes 1 each.
Ez tube is a patented precast concrete footing ez tube is a patented precast concrete footing system consisting of a base section 1 or more upper sections and a threaded rod anchor to secure it into a single solid pier type footing.
To ensure our content is always up to date with current information best practices and professional advice articles are routinely reviewed by industry experts with years of hands on experience.
Ez tube 5 includes 1 each.
According to tim carter from ask the builder the soil upon which you will pour the concrete must be well drained and compact concrete is porous so you need to erect a concrete slab where drainage is not an issue.
Upper sections and 1 each.
Piers are spaced 5 to 10 feet apart depending on the condition of the soil the design of the home and the weight load.
Then with the post anchors properly aligned with your string lines level the piers in both directions.
Upper sections and 1 each.
The mission of our company is to produce the highest quality most dependable and durable precast concrete products with a bold and innovative approach to design engineering and.
Base section 4 each.
Ez tube is a patented precast concrete footing ez tube is a patented precast concrete footing system consisting of a base section 1 or more upper sections and a threaded rod anchor to secure it into a single solid pier type footing.
Superior walls precast concrete foundations are the best solution for residential builders looking for reliable scheduling efficient one day installation ready to finish convenience energy code performance and a manufacturer s limited warranty.
Ez crete a new england based precast concrete specialist provides a range of precast concrete products and services for construction and landscaping professionals.
Soak the piers with a hose and then place them on the footings five to 10 minutes after the footings have been poured when the concrete is stiff enough to support them.
Piers concrete piers are drilled about 12 inches below the frost line and poured first.
Keep the concrete damp for two days allowing it to cure slowly.
5 pros and cons of using precast concrete deck footings written by heather domabyl on jul 13 2010.
Base section 4 each.
Subsurface water can cause the ground the flex creating stress cracks in the cement.