Next you will be pouring concrete to secure the steel rods and keep the walls in place.
Pouring concrete around above ground pool.
Pool decking for an inground pool is simply the flatwork around your pool.
As some contractors may suggest pouring a concrete slab and installing the stone tile on top.
The walls are large concrete slabs that lay flush around the perimeter of the pool held in place by steel rods.
It s also the material of choice for building stairs and decks around above ground pools.
Concrete pool decks are generally used for in ground pools or ones that are dug out of the ground and installed below ground level.
Block pools can have problems because they lacks the steel needed.
Although this is a little more costly than what most pool installers will do there are several good reasons for it.
Another concrete contractor who installs pools mentioned using pool krete but with this being for an above ground pool i didn t know if that was normal necessary instead of concrete.
Many homeowners want to bury their above ground pool to make it appear to be an in ground pool.
Many hard sided above ground pools need buttresses to support their sides but soft sided bladder types don t.
We pour a 2 foot by 2 foot collar all the way around the pool.
We built it on flat ground but it could also be built in a hole and backfilled.
They only need maintenance every so often unlike wood decks.
It can be standard or stamped concrete pavers natural stone or even wood.
Above ground pools come in kits that the homeowner can assemble and do not require you to dig a large hole and pour concrete.
After the pool walls have been assembled and all the plumbing runs have been made it is time to pour concrete.
For around 7000 and a lot of work my son and i built a very solid 13 x 22 x5 oval concrete pool off our deck.
Building one for your in ground pool can not only be rewarding but can a lot of fun with your pool and outdoor entertainment area.
We have a mole worry and want a quality built but unnecessary expense with the pour.
After the frame is complete you can begin pouring the concrete for the base.
Keeping the plumbing simple also cut costs.